PROJECT DETAILS

Detail Engineering Design and IEE Study of Gaujada Budhi Ganga Hydropower Project (20.16 MW)

  • Completed: 10%
  • Client: Budhi Ganga Hydropower Project
  • Location: Bajura
  • Duration: 30 Months
  • Budget: Rs. 1


  • Detail Engineering Design and IEE Study of Jaugada Budhi Ganga HPP

    • Detail Engineering Design and IEE Study of Jaugada Budhi Ganga HPP

    • Detail Engineering Design and IEE Study of Jaugada Budhi Ganga HPP