PROJECT DETAILS

Detailed Feasibility Study of Dudh Khola Hydropower Project 65 MW

  • Completed: 100%
  • Client: Sita Hydropower company Pvt.Ltd
  • Location: Manang
  • Duration: 12 Months
  • Budget: Rs. 1


  • The project has very easy access. The project lies about 157 km north-west of the capital and about 43 km north of Besisahar, the district headquarter of Lamjung and about 83 km north of the Dumre bazaar, the nearest market point of East West Highway from the project area. There is a black topped road of length 117 km from Kathmandu to Besisahar and from Besisahar there is a gravel road about 40 km up to Dharapani. From Dharapani, there is a road head up to the project area. The powerhouse site is easily motorable on the opposite bank of Dharapani while a road about 3 km heads up to the headworks area. A motorable bridge is under construction across the Dudh khola which will make access from the headworks to powerhouse. So only about 1 km access road is to be constructed to the tunnel adit near Tilche

    • Dudh Khola Hydropower Project is a run-of-the-river type project lying in the Nashong Rural Municipality of Manang district. Geographically the project lies between latitudes 28o31'27" N and 28o33'05" N and longitudes 84o21’30" E and 84o23'25" E.  

    • Dudh Khola Hydropower Project is a run-of-the-river type project lying in the Nashong Rural Municipality of Manang district. Geographically the project lies between latitudes 28o31'27" N and 28o33'05" N and longitudes 84o21’30" E and 84o23'25" E.